Visit our Business Solutions website >>

Energenie In-Line Standby Saver Long Lead Length 160 cm

Energenie In-Line Standby Saver Long Lead Length 160 cm
alaScore 77

18 reviews

Apr, 2018

alaTest has collected and analyzed 18 reviews of Energenie In-Line Standby Saver Long Lead Length 160 cm. The average rating for this product is 3.1/5, compared to an average rating of 4.1/5 for other Home Theater Systems for all reviews.

We analyzed user and expert ratings, product age and more factors. Compared to other Home Theater Systems the Energenie In-Line Standby Saver Long Lead Length 160 cm is awarded an overall alaScore™ of 77/100 = Good quality.

Review analysis

(Based on 18 reviews)

User Reviews  

Disclaimer:

Below is a list of reviews for this or similar products. If you think this grouping is wrong please click here to flag.
Read more on our FAQ’s page.
Showing 1 - 18 of 18 Show Reviews: in English

Consumer review (amazon.co.uk)

Amazon.co.uk review summary for Energenie In-Line Standby Saver Long Lead Length 160 cm

 

alaTest has collected and analyzed 18 user reviews of Energenie In-Line Standby Saver Long Lead Length 160 cm from Amazon.co.uk. The average user rating for this product is 3.1/5, compared to an average user rating of 4.3/5 for other Home Theater Systems on Amazon.co.uk.

56% of the reviews on Amazon.co.uk give this product a positive rating.

This summary is based on the products: Energenie In-Line Standby Saver Long Lead Length 160 cmEnergenie In-Line Standby Saver Long Lead Length 160 cm

Apr, 2018